翻訳と辞書
Words near each other
・ Tilt (TV series)
・ Tilt bridge
・ Tilt Cove
・ Tilt Force 2
・ Tilt fuze
・ Tilt O'Whirl
・ Tilt Rock
・ Tilt sensor
・ Tilt table test
・ Tilt test
・ Tilt test (geotechnical engineering)
・ Tilt test (vehicle safety test)
・ Tilt to Live
・ Tilt Train
・ Tilt tray sorter
Tilt up
・ Tilt Ya Head Back
・ Tilt-A-Whirl
・ Tilt-rod fuze
・ Tilt.com
・ Tilt.tv
・ Tilted Arc
・ Tilted block faulting
・ Tilted Kilt Pub & Eatery
・ Tilted large deviation principle
・ Tilted Mill Entertainment
・ Tilted plane focus
・ Tilted Thunder Rail Birds
・ Tilted updraft
・ Tiltfactor Lab


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Tilt up : ウィキペディア英語版
Tilt up

Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
With the tilt-up method, concrete elements (walls, columns, structural supports, etc.) are formed horizontally on a concrete slab; this normally requires the building floor as a building form but may be a temporary concrete casting surface near the building footprint. After the concrete has cured, the elements are "tilted" to the vertical position with a crane and braced into position until the remaining building structural components (roofs, intermediate floors and walls) are secured.〔(), Woodland Construction Co. 2010〕〔(), CON/STEEL,2010〕
Tilt-up construction is a common method of construction throughout North America, several Caribbean nations, Australia, and New Zealand. It is not significantly used in Europe or the northern two thirds of Asia. It is gaining popularity in southern Asia, the Middle East, parts of Africa, Central and South America.
Concrete elements can also be formed at factories away from the building site.〔 〕 Tilt-up differs from prefabrication, or plant cast construction, in that all elements are constructed on the job site. This eliminates the size limitation imposed by transporting elements from a factory to the project site.
==Construction==

Tilt-up construction requires significant organization and collaboration on the building site. The chronological steps that need to be taken for a tilt-up project are: site evaluation, engineering, footings and floor slabs, forming tilt-up panels, steel placement, embeds and inserts, concrete placement, panel erection and panel finishing.〔〔(), Woodland Construction Co., The Tilt-Up Process, 2010.〕 Once the pad (casting surface or floor slab) has cured, forms are built on top. Dimensional lumber, a high quality plywood or fiber board that has at least one smooth face is typically used, although aluminum or steel forms are also common. Carpenters work from engineered drawings designed for each panel or element to construct on site. They incorporate all door and window openings, as well as architectural features and other desired shapes that can be molded into the concrete. Studs, gussets and attachment plates are located within the form for embedding in the concrete. The forms are usually anchored to the casting surface with masonry nails or otherwise adhered to prevent damage to the floor slab.〔(), Woodland Construction Co., Forming Tilt-Up Panels, 2010〕
Next, a chemically reactive bondbreaker is sprayed on the form's surfaces to prevent the cast concrete from bonding with the slab. This allows the cast element to separate from the casting surface once it has cured. This is a critical step, as improper chemical selection or application will prevent the lifting of the panels, and will entail costly demolition and rework.
A rebar grid is constructed inside the forms, after the form release is applied, spaced off the casting surface the desired distance with plastic "chairs". The rebar size and spacing is generally specified by the engineer of record.〔(), CON/STEEL, The Tilt-Up Construction Process, 2010〕
Concrete is then poured, filling the desired thickness and surrounding all steel inserts, embedded features and rebar. The forms are removed when the concrete is cured; rigging is attached and a crane tilts the panel or lifts the element into place. In circumstances when space is at a premium, concrete elements can be cast one on top of the other, or stack cast. Quite often a separate casting pad is poured for this purpose and is removed when the panels are erected.〔(), Woodland Construction Co., Panel Erection, 2010〕
Cranes are used to tilt the concrete elements from the casting slab to a vertical position. The slabs are then most often set onto a foundation and secured with braces until the structural steel and the roof diaphragm is in place.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Tilt up」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.